Safetek personnel have provided a detailed facade report followed by make safe works to the facade and sealing of leaking windows via rope access.
The building is made of precast concrete covered with small ceramic tiles.
Our job was to map out and remove potentially unsafe drummy tiles and spalling concrete and re-patch these areas to stop ingress of water.
Around 30 kg of spalling concrete and loose tiles have been removed from areas above pedestrian traffic and re-patched.