Safetek technicians installed a full building wrap to the scaffold of Gowings and State Theatre buildings.
Eight sections of this massive sign with total weight of close to 2 ton were lifted by crane into position, secured to scaffold and lowered via our rigging.
The job was finished safely in 10 days to the full satisfaction of the client and is one of the largest “building skins” installed to the date in Sydney.